Estimator Dashboard
Run real projects through a cloud-based estimating workspace.
From uploaded plans to cost breakdowns, RFIs, and proposals.
This interface is designed as a realistic estimating software platform with project records,
AI actions, editable estimates, and collaboration-ready outputs.
Today’s pipeline
Utility Substation Upgrade
In Review
Bid due in 4 days · Detailed estimate
Municipal Waterline Extension
Estimate Ready
Proposal draft available · 3 RFIs open
Industrial Power Upgrade
Missing Data
Spec gaps detected in feeder routing package
18 Active projects
$14.2M Bid volume in pipeline
43 RFIs generated this month
68% Workflows completed with AI assistance
Projects
Bid calendar and project list
Track active estimates, bid dates, trade type, and project readiness.
Utility Substation Upgrade
Reviewing
Electrical · Detailed estimate · Bid due Apr 22
12 files
6 RFIs
Proposal draft
Municipal Waterline Extension
Ready
Civil · Budget estimate · Bid due Apr 26
8 files
2 addenda
Client pricing
Industrial Power Upgrade
Blocked
Utility · ROM estimate · Missing design details
4 files
Spec conflicts
Awaiting clarifications
Project Workspace
Utility Substation Upgrade
Client: Northern Grid Energy · Trade: Electrical / Utility · Estimate type: Detailed
Overview
Documents
Scope Review
Estimate
RFIs
Proposal
Activity
Upload plans, specs, addenda, and bid notes
Drag in PDFs, drawing sets, marked-up sheets, subcontractor quotes, and owner instructions.
Upload project files
Drawing Set E-Series PDF
18 sheets · Uploaded today
Technical Specifications PDF
Division 26 + utility notes
Addendum 02 PDF
Equipment revisions flagged
AI Output
Status
Last Run
Owner
Document Review Complete 11:08 AM GroundUp AI
Scope Identification Complete 11:11 AM GroundUp AI
Detailed Estimate Needs Review 11:24 AM Estimator
RFI Draft Set Ready 11:31 AM GroundUp AI
Project intelligence summary
Primary scope includes conduit banks, feeder runs, cable pulling, terminations, and support equipment.
6 risk flags detected around trench depth, pad responsibility, and equipment revision timing.
Utility coordination assumptions required for two feeder crossings.
Proposal language is ready after estimator review of exclusions.
Confidence score improves as files, clarifications, and historical job references are added.
AI Actions
GroundUp workflow engine
Button-driven actions make the product feel like real estimating software instead of a generic chatbot.
Analyze Documents Summarize project files, detect key scope, and identify missing info.
Identify Scope Build included scope, exclusions, assumptions, and conflicts.
Create Estimate Generate labor, materials, equipment, markup, and contingency.
Generate RFIs Draft clarifications tied to drawing and spec references.
Create Proposal Write client-ready scope summary, exclusions, and pricing narrative.
Estimate Builder
Editable cost breakdown
AI generates the first draft. Estimators review, adjust, and finalize before submission.
Cost Category Description Amount
Labor Electrical crew installation and terminations $428,500
Materials Conduit, cable, fittings, supports $912,000
Equipment Trenching support, lifts, pull equipment $146,000
Subcontractors Testing, traffic control, specialty support $98,000
Overhead Project management and supervision $73,500
Markup Commercial margin $112,000
Contingency Design uncertainty and coordination risk $90,000
Total Detailed estimate total $1,860,000
3,420 hrs
Estimated labor hours across conduit, cable, terminations, and commissioning support.
6 risk flags
Open issues tied to trench depth, duct bank responsibility, equipment revisions, and schedule sequencing.
Estimator notes
Night work excluded. Civil by others unless noted. Utility outage windows assumed limited to one mobilization.
RFI Manager
Clarification tracking
AI drafts RFIs, then estimators edit and send them as part of pre-bid coordination.
RFI Reference Status
Confirm trench depth and backfill requirements at south feeder crossing. Sheet E-14 / Civil Note 5 Draft
Clarify whether equipment pads are by electrical or civil contractor. Spec 26 05 00 Ready
Confirm revised transformer lead times align with bid schedule. Addendum 02 Review
Selected RFI preview
Question: Please confirm trench depth and backfill requirements for feeder routing shown near structure S-4.
Reason: Civil and electrical documents appear inconsistent, which impacts trenching assumptions and quantity takeoff.
Potential impact: Material quantities, excavation cost, labor hours, and contingency.
Approve and Send
Proposal Builder
Client-ready proposal drafting
Turn estimate logic into polished language with inclusions, exclusions, assumptions, and pricing summary.
GroundUp AI Drafted proposal summary for Utility Substation Upgrade based on current estimate, scope review, and exclusions.
Estimator Tighten exclusions around night work and clarify civil by others.
GroundUp AI Updated proposal draft with explicit exclusion language and utility outage assumption notes.
Proposal contents
Proposal summary and client introduction
Scope of work narrative
Inclusions and exclusions
Assumptions and clarifications
Pricing summary and commercial notes
Admin + Growth View
Cloud SaaS readiness
The same platform can run internally now and expand into contractor SaaS later.
Internal tool today Use the workspace for your own estimating jobs, refine prompts, and improve reliability with real project data.
Multi-user SaaS next Add organization accounts, subscription billing, permissions, and customer workspaces.
Cloud architecture Recommended stack: Next.js, Supabase, storage, auth, and OpenAI API-based workflow engine.